Acquedotto 18 bar

2 May 2018

Risanamento Fognature SPA restores the water pipeline DN400 – 120 m – 18 bar under the Marlengo Bridge in Merano (BZ) for ASM Spa.
This pipeline “suspended” under the Merano-Bolzano viaduct supplies about 60% of the water needs of the city of Merano.

 

DATA OF THE INTERVENTION

CLIENT ASM di Merano SPA
PROJECT/D.LL. Studio Fischer-Giralt, Ing. Giorgio Giralt – Merano
WORK DURATION 35 days (including excavations, special pieces and restorations)
RELINING DURATION 5 days (inspection, cleaning, rehabilitation,…)

Working pressure 12 bar
Test pressure 18 bar
Diameter 400 mm
Lenght 120 m
Existing pipe material carbon steel
Liner material multilayer polyester fiber + glass fiber
Resin Epoxy potable use
Height difference in entrance / exit 3 m
Technique CIPP – Air + Vapor Insertion

Risanamento Fognature Spa
Loghi certificazioni | Risanamento Fognature Spa
Risanamento Fognature Spa
Loghi certificazioni | Risanamento Fognature Spa
Address

Risanamento Fognature S.P.A
Via Provinciale Ovest 9/1, 31040
Salgareda (TV)

Contacts

E-mail info@risanamentofognature.it
T. +39 0422 807622
F. +39 0422 807755

Company's data

P.IVA Cod. Fisc. 00859210262
Cap. Sociale € 450.000 i.v.
Rea 175459

Address

Risanamento Fognature S.P.A
Via Provinciale Ovest 9/1, 31040
Salgareda (TV)

Contacts

E-mail info@risanamentofognature.it
T. +39 0422 807622
F. +39 0422 807755

Company's data

P.IVA Cod. Fisc. 00859210262
Cap. Sociale € 450.000 i.v.
Rea 175459

Copyright © 2022 Risanamento Fognature spa. All rights reserved.
Cookies Policy | Privacy Policy

Copyright © 2022 Risanamento Fognature spa. All rights reserved. | Cookies Policy | Privacy Policy
Created by Arte Laguna